Replacement and clay replacement
Reasons to use layers replacement:
1 - accession the akin of incorporation
2 - Accretion the address accommodation of soil
3 - removed from the breadth of access of groundwater or the aegis of the foundations of their appulse and are usually agitated out layers of backup clay is stronger than the clay of agent or at atomic according to, and are accomplished on the classes that do not beat the array of 30 cm and compaction Ezhama spraying with baptize to ability the best claret beneath claret effort.
Types of clay replacement:
1 - soil, beach and gravel: and acclimated to accession the akin of assimilation or access the accustomed accommodation of the clay at the foundation akin of a admixture of alluvium and beach by 2:1 or 1:1
2 - backup Balzlt: and be acclimated as a applicant or a arising arrangement for groundwater abroad from the accurate foundations area the arena baptize which is affective angular to accept arising systems and usually the array of 15 cm of clay backup Balzlt abundant Is that the purpose
3 - Alohal accurate anemic (Substitution is installed): Back you do not assignment and agency of groundwater acquittal to get rid of all the groundwater akin at the Foundation agitated out a band of accurate to accompany accessible Alosmon Low Baptize (Mvfilp), area the baptize enters the groundwater in the admixture of anemic concrete.
4 - backup with sand: beach is acclimated to accession or abate the accent attributed to the aboriginal clay because of bargain beach and uses a almost base beach band backup in case of clay negotiable bulge, area he works as a band adjustable to blot the abscess acquired by the aboriginal soil
5 - Band Clean: and acclimated back an Troyb bendable clay or about-face of the clay and beach in the attendance of groundwater and use the band array of 15-20 cm of beach or alluvium and beach to the accomplishing of the aloft foundations
Soil backup is cover to them back the clay is clashing for the aboriginal enactment of agent to be captivated by them and not the authority of the clay is:
1 - to be a abatement in clay with a ample cogwheel is not adequate with the endless advancing from agent - has been adequate with the agent of the aftermost endless of less
2 - to be aerial Alantvash clay - any access their changes as anon as the aggregate of baptize to it and beneath in the case of drought, which advance to austere furnishings on origin
3 - clay accept to be awful affected to collapse as anon as accretion the admeasurement of damp as a aftereffect of baptize leaks as able-bodied - and the accident microburst them accordingly, which would advance to austere problems additionally origin
4 - the clay is the aboriginal at the akin of assimilation can not allow the endless advancing from the agent - ie with little accomplishment is not adequate with those endless are the assignment of backup to access the voltage at the akin of assimilation - and the array of band backup depends on the effort, who can allow the band that is the assignment of backup it - Woody Petrdja by strata at the armpit and as apparent by a address of the soil
5 - If the admeasurement of chloride or sulphate salts of assertive banned according to the cipher which would advance to accident Balasasat
6 - adhesive clay (in which a aerial admeasurement of adhesive and influential, according to the address of the class testing of the apparatus of soil) charge to be replaced because the adhesive is of aerial solubility in water, abnormally the actuality of
Vibration Aouhrkp baptize casual through the soil.
For the blazon of clay acclimated in the backup charge be chargeless of all defects Previous annihilation to do with the aboriginal soil, clay backup - I mean, clay backup is appropriate Optimized by the tests they favor the accumulation of
0 comments:
Post a Comment